There’s a detail most Washington DC dental practice owners miss when they first sit down with a contractor — and it ends up costing between $50,000 and $80,000 to correct after the walls are already closed. It isn’t the flooring. It isn’t the millwork. It’s the mechanical, electrical, and plumbing infrastructure that wasn’t sized for… Read more »